Contact Info

  • 5 The Quadrant
  • info@theenergyrevolution.co.uk
  • 024 7510 3306

Case Studies

Go Back

Holiday Inn, Barnwood

Comprehensive survey completed to determine appropriate measures to reduce energy costs and carbon footprint.

Installation of 2 50 kW CHP engines. These are sized to the hotels energy requirements and allow not only electricity and carbon savings but also utilisation of heat produced by the CHP engines.

Case Facts

115,000 kWh - Electricity savings in initial 2 month period
227,900 kWt - Heat savings in initial 2 month period
179 Tonnes - Annual carbon savings
Holiday Inn, Barnwood