Holiday Inn, High Wycombe
Comprehensive survey completed to determine appropriate measures to reduce energy costs and carbon footprint.
Installation of a 50 kW CHP engine. These are sized to the hotels energy requirements and allow not only electricity and carbon savings but also utilisation of heat produced by the CHP engines.
Case Facts
152,466 kWh - Electricity savings in initial 5 month period
282,820 kWt - Heat savings in initial 5 month period
66 Tonnes - Annual carbon savings