Holiday Inn, Hull Marina
Comprehensive survey completed to determine appropriate measures to reduce energy costs and carbon footprint.
Installation of a 50 kW CHP engine. These are sized to the hotels energy requirements and allow not only electricity and carbon savings but also utilisation of heat produced by the CHP engines.
Case Facts
174,268 kWh - Electricity savings in initial 6 month period
317,800 kWt - Heat savings in initial 6 month period
79 Tonnes - Annual carbon savings